成人做爰黄AA片免费看三区,日韩中文字幕在线观看,国产在线观看AV,精品人妻无码一区二区出白浆潮喷

Preparation work before production of kneading machine and sewing agent production equipment

2025-03-29 11:03:20 1

The kneading machine and sewing agent production equipment are ideal machines for pre molding, mixing, vulcanization, and re healing of low viscosity, elastoplastic raw materials. The kneading machine and sewing agent production equipment can be used to produce and manufacture silicone, sealants, hot melt adhesives, food adhesives, pharmaceutical and traditional Chinese medicine preparations, etc. The kneading machine and sewing agent production equipment are unique mixing and stirring machines. It is common to use two ∑ blades and parallel circular tangent differential sorting, where one blade has a faster speed and the other has a slower speed, which is conducive to causing shear stress. Different blade speeds promote the quick cutting of the raw materials of the mixed rubber, thereby enabling the raw materials to be mixed evenly.


1. After equipment installation, carry out cleaning, decontamination, and scrubbing of rust resistant plant oils and fats. Inspect each lubrication point and introduce lubricating grease.


2. Before driving, check the tension level of the V-belt and adjust the anchor bolts to move the motor to an appropriate position.


3. Check whether the standard parts are loose, whether the steam pipeline is leaking, and whether the power circuit and electrical equipment are safe. The electric heating kneading machine must have a grounding system.


4. Clean and tidy the pre molding room before debugging. Perform 10-15 minutes of aviation component rotation, confirm that the equipment is operating normally before adding materials for production and manufacturing. Generally, the transmission gear (including reducer) of a new mobile phone produces a lot of noise during the initial application, which will naturally decrease after a period of time when it is in and out.


5. When using steam heating, valves and pressure gauges should be installed at the inlet of the steam pipeline, and the working pressure of the steam should not exceed the specified working pressure for the mixing tank indicated on the label.


6. When pre shaping the mixing paddle, it is necessary to reduce the application flipping.


作者不详中文字幕中文一区 | 性一交一伦一片A片在线观看 | 九九中文字幕在线免费观看 | 中文字幕综合八区 | 少妇高潮ZZZZZZZyⅩ脱出 | 亚州AV,AV一区| 少女视频哔哩哔哩免费播放在线观看 | 无码中文字幕一区二区免费蜜桃 | 亚洲AV秘 无码一区在线男奴 | 天堂网永久2018 | 丰满老妇高潮一级A片 | 在线不卡中文字幕观看 | 国产女人十八毛水真多 | 亚洲AV无码一区二区三区老牛 | aaaaaa毛片 | 无码人妻精品一区二区蜜桃网站 | 222aaa免费国产 | 无码熟妇人妻啪区 | 国产农村色情性按摩91大片 | 国产无吗又粗又长又硬又爽 | Chinese熟妇XXX仙踪林 | 四川少妇BBB搡BBBB槡BBBB 2019中文字幕在线电视剧免费观看 | 国产a视频播放器 | 特黄三级又爽又粗又大 | 国产精品久久久久久久无码蜜臀 | 免费看一级一级人妻片 | 欧美 激情 成人 | 久久人人爽人人爽人人av三级 | 无码一区二区免费- | 国产1区2区3区中文字幕 | 亚洲高清无码自慰 | 成人无码区免费A片视频野外 | 精品AV一区二区 | 欧美黑人一级爽快片婬片高清 | 成人午夜天天视频官网 | 日本婬乱A片AAA毛片麻豆软件 | 国产又大又硬又粗又长视频 | 黄色成人无码视频 | 91日本美女全裸脱衣视频网站在线观看 | 久久久久久久无码 | 777午夜精品久久久 蜜芽青娱乐亚洲精品网 |