成人做爰黄AA片免费看三区,日韩中文字幕在线观看,国产在线观看AV,精品人妻无码一区二区出白浆潮喷

Preparation work before production of kneading machine and sewing agent production equipment

2025-03-29 11:03:20 1

The kneading machine and sewing agent production equipment are ideal machines for pre molding, mixing, vulcanization, and re healing of low viscosity, elastoplastic raw materials. The kneading machine and sewing agent production equipment can be used to produce and manufacture silicone, sealants, hot melt adhesives, food adhesives, pharmaceutical and traditional Chinese medicine preparations, etc. The kneading machine and sewing agent production equipment are unique mixing and stirring machines. It is common to use two ∑ blades and parallel circular tangent differential sorting, where one blade has a faster speed and the other has a slower speed, which is conducive to causing shear stress. Different blade speeds promote the quick cutting of the raw materials of the mixed rubber, thereby enabling the raw materials to be mixed evenly.


1. After equipment installation, carry out cleaning, decontamination, and scrubbing of rust resistant plant oils and fats. Inspect each lubrication point and introduce lubricating grease.


2. Before driving, check the tension level of the V-belt and adjust the anchor bolts to move the motor to an appropriate position.


3. Check whether the standard parts are loose, whether the steam pipeline is leaking, and whether the power circuit and electrical equipment are safe. The electric heating kneading machine must have a grounding system.


4. Clean and tidy the pre molding room before debugging. Perform 10-15 minutes of aviation component rotation, confirm that the equipment is operating normally before adding materials for production and manufacturing. Generally, the transmission gear (including reducer) of a new mobile phone produces a lot of noise during the initial application, which will naturally decrease after a period of time when it is in and out.


5. When using steam heating, valves and pressure gauges should be installed at the inlet of the steam pipeline, and the working pressure of the steam should not exceed the specified working pressure for the mixing tank indicated on the label.


6. When pre shaping the mixing paddle, it is necessary to reduce the application flipping.


亚洲无码精品aV | 成人精品久久久午夜福利 | 99re国产麻豆精品中文在线 | ,国产乱人伦无码视频 | 久久免费精品视频 | AV簧片无码入口 | mm131美女视频在线观看 | 美女被操视频在线观看精品一区 | 国产精品久久久久久久久免费看 | 成人在线观看视频网址 | 亚无毛码大u免费七mhrd和 | 91麻豆精品国产理伦片在线观看 | 国产女人18毛片水真多18精品\i | 国产亚洲视频在线 | 波多野结衣无码影音先锋在线 | 人妻无码中文字幕麻豆精品 | 无码国产精品一区二区免费16 | 91精品少妇a 6 2v久久 | 插传媒AV综合网 | 三上悠亚AV一区二区三区 | 久久亚洲AV成人无码国产最大 | 一区二区三区亚洲无 | 国产女人与禽ZoZo性伦 | 好好日在线视频观看 | 国产不卡AV在线播放 | 国产91对白在线观看九色 | 免费观看中文字幕 | 国产电在线观看一区二区三 | www免费黄色网 | 精品国产一区二区视频 | 欧美日韩国产综合一区二区三区 | 91精品国产人妻一区二区 | EEUSS国产一区二区三区JDAV | av中文字幕第一页 | 国产精品羞羞无码久久久莉榴花 | 午夜熟女毛片蜜桃传媒 | 三级片小视频看看无码区 | 精品91秘 一区二区三区 | 国产又粗又大又爽又黄的视频 | 久久久久久久无码 | 黄色网址在线免费观看 |