成人做爰黄AA片免费看三区,日韩中文字幕在线观看,国产在线观看AV,精品人妻无码一区二区出白浆潮喷

Preparation work before production of kneading machine and sewing agent production equipment

2025-03-29 11:03:20 1

The kneading machine and sewing agent production equipment are ideal machines for pre molding, mixing, vulcanization, and re healing of low viscosity, elastoplastic raw materials. The kneading machine and sewing agent production equipment can be used to produce and manufacture silicone, sealants, hot melt adhesives, food adhesives, pharmaceutical and traditional Chinese medicine preparations, etc. The kneading machine and sewing agent production equipment are unique mixing and stirring machines. It is common to use two ∑ blades and parallel circular tangent differential sorting, where one blade has a faster speed and the other has a slower speed, which is conducive to causing shear stress. Different blade speeds promote the quick cutting of the raw materials of the mixed rubber, thereby enabling the raw materials to be mixed evenly.


1. After equipment installation, carry out cleaning, decontamination, and scrubbing of rust resistant plant oils and fats. Inspect each lubrication point and introduce lubricating grease.


2. Before driving, check the tension level of the V-belt and adjust the anchor bolts to move the motor to an appropriate position.


3. Check whether the standard parts are loose, whether the steam pipeline is leaking, and whether the power circuit and electrical equipment are safe. The electric heating kneading machine must have a grounding system.


4. Clean and tidy the pre molding room before debugging. Perform 10-15 minutes of aviation component rotation, confirm that the equipment is operating normally before adding materials for production and manufacturing. Generally, the transmission gear (including reducer) of a new mobile phone produces a lot of noise during the initial application, which will naturally decrease after a period of time when it is in and out.


5. When using steam heating, valves and pressure gauges should be installed at the inlet of the steam pipeline, and the working pressure of the steam should not exceed the specified working pressure for the mixing tank indicated on the label.


6. When pre shaping the mixing paddle, it is necessary to reduce the application flipping.


93人妻人人揉人人澡人人 | 玩弄放荡的人妻熟妇视频 | 懂色av无码中文字幕一区二区三区 | www.av天堂.com | 在线观看黄色视频的网站上 | 女人自慰免费观看 | 特级西西WWW96 | 做爰高潮A片〈毛片〉 | 熟女肛交视频桃子视频 | 婷婷五月激情视频 | 强被迫伦轩高潮无码日本 | 好吊妞在线视频观看 | 大又大又粗又硬又爽少妇毛片 | 巨爆乳A片在线观看播放 | 国产精品久久久久久久无码蜜臀 | 久久精品无码一区二区国产26p | 无码精品人妻区二区三区青椒 | 免费在线黄色视频网站 | 精品人妻a∨一区二区三区,国产 | 女人高潮一级A片黄毛 | 国产高清无套内谢粉嫩小泬 | 亚洲av无码乱码国产 | 亚洲乱码国产乱码精品精不卡 | 在线免费观看黄片 | 亚洲日韩首页中文字幕在线 | HD丝袜高跟性专区av | 神马老子午夜噜噜噜噜噜噜 | 在线观看中文字幕无码 | BBB片一毛片A片AA少妇 | 欧美第一区在线观看 | 福利导航站 xxxx | 亚洲视频一区二区在线观看 | 影视先锋无码在线观看 | 国产精品a v久久久久久毛片 | 国产精品伦子伦露脸 | 日韩无码看片毛片网站黄色 | 黄色中文字幕视频 | 日韩欧美一区二区久久婷婷 | 亚洲午夜精品一区二区 | 性一交一乱一奷一区二区三区下载 | 手机看片一区二区三区不卡 |